7 - Cemaes Bay to City Dulas
A tramway linked a quarry at Craig Wen to the Winding House / Incline.
The two tracks of the gravity powered incline enabled loaded trucks
to be lowered down to the Porth Wen Brickworks Crushing House .
Ref: NW 819
Date: 08/05/2022
Location: SH 3996 9472