Old Colwyn Mini Pier - 1
Old Colwyn Mini Pier - 1

A view of the new Pier - a fishing Pier
The work on the seafront included building a 720m long rock barricade in front of the existing seawall using 160,000 tonnes of rock.
And raising the promenade and road by 1.5 metres to protect the railway embankment and A55 Expressway.

Ref: NW 4530

Date: 04/06/2025

Location: SH 8696 7873

Old Colwyn Mini Pier - 1

A view of the new Pier - a fishing Pier
The work on the seafront included building a 720m long rock barricade in front of the existing seawall using 160,000 tonnes of rock.
And raising the promenade and road by 1.5 metres to protect the railway embankment and A55 Expressway.

Ref: NW 4530

Date: 04/06/2025

Location: SH 8696 7873