Ffestiniog Railway - Dduallt Spiral
Ffestiniog Railway - Dduallt Spiral

The locomotive 'Linda',on the Dduallt Spiral Bridge , Linda was built by the Hunslet Engine Company Leeds
in1893 for the Penrhyn Quarry Railway (1801-1962).
The Dduallt Spiral is where the Railway track crosses over itself to gain height. It is the only rail spiral in Britain.
When the Ffestiniog Hydro-electric Power Station opened in 1957 a section of the railways track was submerged .
When the track was rebuilt it had to pass the Tanygrisiau Res. at a higher level, and to gain sufficient height a spiral was built
at Dduallt which takes the track over itself. The new track layout was built 1965 -1978 mainly by a volunteer workforce.
------------------
A FP from Rhyd-y-sarn ( see Afon Goedol Photo), heads westward and joins the Cambrian Way Path which passes the Dduallt Station building -
the most remote station on the Ffestiniog Railway, as it can only be reached by public footpaths.

Ref: NW 4666

Date: 26/07/2025

Location: SH 6775 4199

Ffestiniog Railway - Dduallt Spiral

The locomotive 'Linda',on the Dduallt Spiral Bridge , Linda was built by the Hunslet Engine Company Leeds
in1893 for the Penrhyn Quarry Railway (1801-1962).
The Dduallt Spiral is where the Railway track crosses over itself to gain height. It is the only rail spiral in Britain.
When the Ffestiniog Hydro-electric Power Station opened in 1957 a section of the railways track was submerged .
When the track was rebuilt it had to pass the Tanygrisiau Res. at a higher level, and to gain sufficient height a spiral was built
at Dduallt which takes the track over itself. The new track layout was built 1965 -1978 mainly by a volunteer workforce.
------------------
A FP from Rhyd-y-sarn ( see Afon Goedol Photo), heads westward and joins the Cambrian Way Path which passes the Dduallt Station building -
the most remote station on the Ffestiniog Railway, as it can only be reached by public footpaths.

Ref: NW 4666

Date: 26/07/2025

Location: SH 6775 4199